Bengaluru
Metro from BTM Layout to Nagasandra
49 minTime
₹80Est. fare
1Change(s)
Change at Rashtreeya Vidyalaya Road.
Take the Yellow Line: BTM Layout to Rashtreeya Vidyalaya Road
- BTM Layout
- Jayadeva Hospital
- Ragigudda
- Rashtreeya Vidyalaya Road
Take the Green Line: Rashtreeya Vidyalaya Road to Nagasandra
- Rashtreeya Vidyalaya Road
- Jayanagar
- Southend Circle
- Lalbagh
- National College
- Krishna Rajendra Market
- Chickpete
- Majestic
- Mantri Square Sampige Road
- Srirampura
- Mahakavi Kuvempu Road
- Rajajinagar
- Mahalakshmi
- Sandal Soap Factory
- Yeshwanthpur
- Goraguntepalya
- Peenya
- Peenya Industry
- Jalahalli
- Dasarahalli
- Nagasandra
How to travel from BTM Layout to Nagasandra
Going from BTM Layout to Nagasandra on the Bengaluru metro takes 1 change. You travel 23 stops in total, roughly 22.7 km along the track.
- Leg 1, Yellow Line: board at BTM Layout on a train towards Rashtreeya Vidyalaya Road, ride 3 stops (about 3.2 km) and get off at Rashtreeya Vidyalaya Road.
- Leg 2, Green Line: board at Rashtreeya Vidyalaya Road on a train towards Madavara, ride 20 stops (about 19.5 km) and get off at Nagasandra.
Where to change
- At Rashtreeya Vidyalaya Road change from the Yellow Line to the Green Line.
Platform and train direction boards show the terminal station name. Always follow the signs at the station.
Fare & timings
| Normal fare | ₹80 |
| Smart card fare (approx.) | ₹76 |
| Distance (approx.) | 22.7 km |
| Route difficulty | Moderate |
| Interchanges | 1 |
| Train timings (approx.) | about 5:00 am to 11:00 pm |
More routes and places
FAQs
How do I go from BTM Layout to Nagasandra by metro?
Take the Yellow Line and change at Rashtreeya Vidyalaya Road. Total 23 stops.
What is the metro fare from BTM Layout to Nagasandra?
The estimated fare is about Rs 80. Confirm with the operator.
How long does it take?
About 49 minutes including 1 change(s).