Bengaluru

Metro from Deepanjali Nagar to Electronic City

FromDeepanjali NagarToElectronic City
Reverse
58 minTime
₹90Est. fare
2Change(s)

Change at Majestic, Rashtreeya Vidyalaya Road.

Deepanjali NagarAttiguppeVijayanagarHosahalliMagadi RoadKSR Railway StationMajestic (change)ChickpeteKrishna Rajendra MarketNational CollegeLalbaghSouthend CircleJayanagarRashtreeya Vidyalaya Road (change)RagiguddaJayadeva HospitalBTM LayoutCentral Silk BoardBommanahalliHongasandraKudlu GateSingasandraHosa RoadBeratena AgraharaElectronic City

Take the Purple Line: Deepanjali Nagar to Majestic

Take the Green Line: Majestic to Rashtreeya Vidyalaya Road

Take the Yellow Line: Rashtreeya Vidyalaya Road to Electronic City

How to travel from Deepanjali Nagar to Electronic City

Going from Deepanjali Nagar to Electronic City on the Bengaluru metro takes 2 changes. You travel 24 stops in total, roughly 25.3 km along the track.

  1. Leg 1, Purple Line: board at Deepanjali Nagar on a train towards Whitefield (Kadugodi), ride 6 stops (about 6.2 km) and get off at Majestic.
  2. Leg 2, Green Line: board at Majestic on a train towards Silk Institute, ride 7 stops (about 6.4 km) and get off at Rashtreeya Vidyalaya Road.
  3. Leg 3, Yellow Line: board at Rashtreeya Vidyalaya Road on a train towards Delta Electronics Bommasandra, ride 11 stops (about 12.7 km) and get off at Electronic City.

Where to change

Platform and train direction boards show the terminal station name. Always follow the signs at the station.

Fare & timings

Normal fare₹90
Smart card fare (approx.)₹86
Distance (approx.)25.3 km
Route difficultyDifficult
Interchanges2
Train timings (approx.)about 5:00 am to 11:00 pm

More routes and places

Popular places reached from Electronic City: Electronic City (tech park area).

FAQs

How do I go from Deepanjali Nagar to Electronic City by metro?

Take the Purple Line and change at Majestic, Rashtreeya Vidyalaya Road. Total 24 stops.

What is the metro fare from Deepanjali Nagar to Electronic City?

The estimated fare is about Rs 90. Confirm with the operator.

How long does it take?

About 58 minutes including 2 change(s).