Delhi
Metro from Barakhamba Road to Shivaji Park
33 minTime
₹43Est. fare
2Change(s)
Change at Kirti Nagar, Ashok Park Main.
Take the Blue Line: Barakhamba Road to Kirti Nagar
- Barakhamba Road
- Rajiv Chowk
- RK Ashram Marg
- Jhandewalan
- Karol Bagh
- Rajendra Place
- Patel Nagar
- Shadipur
- Kirti Nagar
Take the Green Line Branch: Kirti Nagar to Ashok Park Main
- Kirti Nagar
- Satguru Ram Singh Marg
- Ashok Park Main
Take the Green Line: Ashok Park Main to Shivaji Park
- Ashok Park Main
- Punjabi Bagh
- Punjabi Bagh West
- Shivaji Park
Fare & timings
| Normal fare | ₹43 |
| Smart card fare (approx.) | ₹39 |
| Distance (approx.) | 12.6 km |
| Route difficulty | Difficult |
| Interchanges | 2 |
| Train timings (approx.) | about 5:00 am to 11:30 pm |
FAQs
How do I go from Barakhamba Road to Shivaji Park by metro?
Take the Blue Line and change at Kirti Nagar, Ashok Park Main. Total 13 stops.
What is the metro fare from Barakhamba Road to Shivaji Park?
The estimated fare is about Rs 43. Confirm with the operator.
How long does it take?
About 33 minutes including 2 change(s).