Kolkata › Blue Line

Metro from Netaji Bhavan to Shyambazar

23 minTravel time
See operatorFare
10Stops

Take the Kolkata Blue Line towards Dakshineswar from Netaji Bhavan and get off at Shyambazar. No interchange required.

Route map

Netaji BhavanRabindra SadanMaidanPark StreetEsplanadeChandni ChowkCentralMahatma Gandhi RoadGirish ParkShobhabazar SutanutiShyambazar

Stations on the way

Reverse: Shyambazar to Netaji Bhavan

Travel tips

Fare & timings

FareCheck the official operator
Distance (approx.)12.0 km
Route difficultyEasy
Interchanges0

FAQs

How many stations are there from Netaji Bhavan to Shyambazar by metro?

There are 10 stops from Netaji Bhavan to Shyambazar on the Kolkata Blue Line (no change needed).

What is the metro fare from Netaji Bhavan to Shyambazar?

Fares are set by the operator; check the official operator for the exact fare.

How long does the metro take from Netaji Bhavan to Shyambazar?

About 23 minutes.

Related routes