Kolkata

Metro from Phoolbagan to Dakshineswar

34 minTime
See operatorFare
1Change(s)

Change at Esplanade.

PhoolbaganSealdahEsplanade (change)Chandni ChowkCentralMahatma Gandhi RoadGirish ParkShobhabazar SutanutiShyambazarBelgachhiaDum DumNoaparaBaranagarDakshineswar

Take the Green Line: Phoolbagan to Esplanade

Take the Blue Line: Esplanade to Dakshineswar

Reverse route

Fare & timings

FareCheck the official operator
Distance (approx.)15.6 km
Route difficultyModerate
Interchanges1

FAQs

How do I go from Phoolbagan to Dakshineswar by metro?

Take the Green Line and change at Esplanade. Total 13 stops.

What is the metro fare from Phoolbagan to Dakshineswar?

Fares are set by the operator; confirm with the operator.

How long does it take?

About 34 minutes including 1 change(s).